215
$1B

TIP
Projects

60
$254M

Active
Projects

Status

Filter List: 
Click on project name to learn more

View Funding Table
EPM PIN: 6691
Location: "VINEYARD CONNECTOR, 800 No. to I-15 American Fork Interch."
Sponsor: MAG
Status: Active
Total Cost: $38,005,904

View Funding Table
EPM PIN: 9227
Location: US-6; MP 177.20 - 177.20
Sponsor: UDOT
Status: Active
Total Cost: $375,000

View Funding Table
EPM PIN: 9994
Location: US-89; MP 345.64 - 348.07
Sponsor: UDOT
Status: Active
Total Cost: $43,375,599

View Funding Table
EPM PIN: 10997
Location: Corridor Preservation for Pioneer Crossing Connector
Sponsor: MAG
Status: Scoping
Total Cost: $14,330,524

View Funding Table
EPM PIN: 11475
Location: SR-115; MP 2.30 - 3.69 & SR-75; MP .00 - 2.02
Sponsor: UDOT
Status: Undr Const
Total Cost: $8,720,228

View Funding Table
EPM PIN: 11625
Location: Lindon Heritage Trail - Pioneer LN to Utah Lake
Sponsor: MAG
Status: Active
Total Cost: $1,589,852

View Funding Table
EPM PIN: 11897
Location: US-89; MP 334.56 - 336.10
Sponsor: UDOT
Status: Undr Const
Total Cost: $25,984,815

View Funding Table
EPM PIN: 12684
Location: SR-176; MP .00 - 1.05 & SR-114; MP 7.64 - 7.71 & SR-52; MP .00 - .03 & Vineyard Connector from Main St. to 1600 N
Sponsor: UDOT
Status: Active
Total Cost: $15,664,424

View Funding Table
EPM PIN: 13067
Location: SR-52; MP .91 - 1.60
Sponsor: MAG
Status: Scoping
Total Cost: $738,000

View Funding Table
EPM PIN: 13068
Location: SR-146; MP .00 - 5.31
Sponsor: MAG
Status: Scoping
Total Cost: $7,469,000

View Funding Table
EPM PIN: 13074
Location: AF 200 S multimodal improvements
Sponsor: MAG
Status: Scoping
Total Cost: $4,715,391

View Funding Table
EPM PIN: 13076
Location: Cnty:FA-2882; MP .00 - 1.54 & Lehi Roads
Sponsor: MAG
Status: Scoping
Total Cost: $2,121,851

View Funding Table
EPM PIN: 13082
Location: Cnty:FA-2895; MP .47 - 1.57
Sponsor: MAG
Status: Undr Const
Total Cost: $12,397,000

View Funding Table
EPM PIN: 13086
Location: Utah Lake Trail - Spring Creek Segment
Sponsor: MAG
Status: Scoping
Total Cost: $1,100,000

View Funding Table
EPM PIN: 13253
Location: SR-73 Corridor Presrvation
Sponsor: UDOT
Status: Scoping
Total Cost: $24,862,073

View Funding Table
EPM PIN: 13420
Location: SR-85; MP .00 - 2.98 & SR-194; MP .00 - 2.98 & SR-194; MP .33 - 2.98
Sponsor: UDOT
Status: Scoping
Total Cost: $395,000,000

View Funding Table
EPM PIN: 14087
Location: "Elk Ridge DR; SR 198 to 8000 S, Salem"
Sponsor: MAG
Status: Active
Total Cost: $18,194,051

View Funding Table
EPM PIN: 14088
Location: "SR-129; MP 5.68 - 5.87 & SR-74; MP 2.19 - 2.33 & Murdock Connector RD; Alpine HWY to North County BLVD, Highland"
Sponsor: MAG
Status: Undr Const
Total Cost: $11,881,319

View Funding Table
EPM PIN: 14255
Location: US-89; MP 340.09 - 340.17
Sponsor: UDOT
Status: Undr Const
Total Cost: $106,000

View Funding Table
EPM PIN: 14463
Location: US-89; MP 339.42 - 339.94
Sponsor: UDOT
Status: Awarded
Total Cost: $3,700,000

View Funding Table
EPM PIN: 14497
Location: I-15; MP 269.62 - 269.75
Sponsor: UDOT
Status: Scoping
Total Cost: $491,147

View Funding Table
EPM PIN: 14557
Location: I-15; MP 265.00 - 269.40
Sponsor: MAG
Status: Scoping
Total Cost: $4,000,000

View Funding Table
EPM PIN: 14801
Location: SR-114; MP 10.03 - 10.03
Sponsor: UDOT
Status: Scoping
Total Cost: $75,000

View Funding Table
EPM PIN: 14816
Location: US-89; MP 337.87 - 340.73
Sponsor: UDOT
Status: Active
Total Cost: $187,000

View Funding Table
EPM PIN: 14987
Location: Lakeshore trail in Saratoga Springs
Sponsor: MAG
Status: Undr Const
Total Cost: $1,646,000

View Funding Table
EPM PIN: 14988
Location: New RR connection
Sponsor: MAG
Status: Scoping
Total Cost: $6,638,299

View Funding Table
EPM PIN: 14989
Location: County wide
Sponsor: MAG
Status: Scoping
Total Cost: $405,000

View Funding Table
EPM PIN: 14990
Location: Cnty:FA-2946; MP 5.22 - 6.37
Sponsor: MAG
Status: Scoping
Total Cost: $4,250,000

View Funding Table
EPM PIN: 14992
Location: Cnty:FA-3062; MP .83 - 1.22
Sponsor: MAG
Status: Undr Const
Total Cost: $4,100,000

View Funding Table
EPM PIN: 14995
Location: New road connection in AF
Sponsor: MAG
Status: Scoping
Total Cost: $1,350,000

View Funding Table
EPM PIN: 14996
Location: Cnty:FA-2888; MP .84 - 1.34
Sponsor: MAG
Status: Scoping
Total Cost: $2,410,800

View Funding Table
EPM PIN: 14997
Location: Cnty:FA-2980; MP .42 - .46
Sponsor: MAG
Status: Scoping
Total Cost: $2,300,000

View Funding Table
EPM PIN: 15153
Location: I-15; MP 258.60 - 259.60 & Cnty:FA-2845; MP .00 - 2.31 & I-15; MP 258.50 - 259.50
Sponsor: MAG
Status: Scoping
Total Cost: $64,605,121

View Funding Table
EPM PIN: 15244
Location: SR-52; MP .15 - .15 & local streets
Sponsor: UDOT
Status: Undr Const
Total Cost: $105,440

View Funding Table
EPM PIN: 15349
Location: SR-114; MP 6.08 - 6.17
Sponsor: UDOT
Status: Active
Total Cost: $783,001

View Funding Table
EPM PIN: 15454
Location: US-6; MP 200.60 - 201.15
Sponsor: UDOT
Status: Scoping
Total Cost: $726,962

View Funding Table
EPM PIN: 15548
Location: Various
Sponsor: UDOT
Status: Scoping
Total Cost: $12,679,805

View Funding Table
EPM PIN: 15605
Location: TO PLEASANT GROVE / LINDON; MP .00 - .22 & FROM PLEASANT GROVE / LINDON; MP .00 - .19 & TO PLEASANT GROVE / LINDON; MP .00 - .02 & SR-135; MP .35 - .73 & SR-129; MP 1.68 - 1.87 & I-15; MP 272.72 - 278.60
Sponsor: UDOT
Status: Active
Total Cost: $2,110,000

View Funding Table
EPM PIN: 15732
Location: US-89; MP 334.11 - 334.86
Sponsor: UDOT
Status: Scoping
Total Cost: $8,375,000

View Funding Table
EPM PIN: 15826
Location: SR-114; MP 3.74 - 4.01
Sponsor: UDOT
Status: Undr Const
Total Cost: $2,095,725

View Funding Table
EPM PIN: 15871
Location: SF 1100 E Trailhead
Sponsor: MAG
Status: Undr Const
Total Cost: $509,566

View Funding Table
EPM PIN: 15894
Location: SR-115; MP 6.88 - 7.14
Sponsor: UDOT
Status: Scoping
Total Cost: $71,460

View Funding Table
EPM PIN: 16282
Location: SR-92; MP .46 - 4.94
Sponsor: UDOT
Status: Scoping
Total Cost: $1,747,099

View Funding Table
EPM PIN: 16497
Location: US-6; MP 173.69 - 174.00
Sponsor: UDOT
Status: Scoping
Total Cost: $8,350,000

View Funding Table
EPM PIN: 16509
Location: SR-129; MP 1.45 - 1.92 & SR-135; MP .35 - .73
Sponsor: UDOT
Status: Active
Total Cost: $15,310,098

View Funding Table
EPM PIN: 16682
Location: SR-178; MP .00 - 1.20 & SR-198; MP .00 - 6.60
Sponsor: UDOT
Status: Undr Const
Total Cost: $7,261,304

View Funding Table
EPM PIN: 16684
Location: SR-198; MP 6.42 - 10.48 & SR-198; MP 11.61 - 12.34
Sponsor: UDOT
Status: Proposed
Total Cost: -

View Funding Table
EPM PIN: 16721
Location: Corridor Preservation for North County Blvd
Sponsor: UDOT
Status: Scoping
Total Cost: $500,000

View Funding Table
EPM PIN: 16741
Location: SR-147; MP 4.55 - 4.87
Sponsor: UDOT
Status: Advertised
Total Cost: $1,555,174

View Funding Table
EPM PIN: 16991
Location: US-89; MP 334.86 - 349.54
Sponsor: UDOT
Status: Scoping
Total Cost: $710,000

View Funding Table
EPM PIN: 16992
Location: SR-92; MP .99 - 7.55
Sponsor: UDOT
Status: Scoping
Total Cost: $151,270

View Funding Table
EPM PIN: 16994
Location: SR-51; MP .00 - 3.34
Sponsor: UDOT
Status: Scoping
Total Cost: $669,780

View Funding Table
EPM PIN: 16995
Location: Cnty:FA-2849; MP 2.39 - 2.66
Sponsor: UDOT
Status: Scoping
Total Cost: $2,372,826

View Funding Table
EPM PIN: 16996
Location: Cnty:FA-3044; MP .08 - .08
Sponsor: UDOT
Status: Scoping
Total Cost: $7,570,326

View Funding Table
EPM PIN: 16997
Location: Cnty:FA-2899; MP 1.72 - 1.75
Sponsor: UDOT
Status: Scoping
Total Cost: $330,435

View Funding Table
EPM PIN: 16998
Location: Cnty:FA-2878; MP .00 - 1.24
Sponsor: UDOT
Status: Scoping
Total Cost: $4,480,870

View Funding Table
EPM PIN: 17038
Location: I-15; MP 255.29 - 256.11
Sponsor: UDOT
Status: Scoping
Total Cost: $2,000,000

View Funding Table
EPM PIN: 17051
Location: Cnty:FA-2998; MP .95 - 1.59 & New Construction of Lakview Pkwy. New road
Sponsor: MAG
Status: Scoping
Total Cost: $4,260,870

View Funding Table
EPM PIN: 17056
Location: Cnty:FA-2946; MP 4.06 - 4.20
Sponsor: MAG
Status: Scoping
Total Cost: $1,391,304

View Funding Table
EPM PIN: 17057
Location: US-89; MP 338.06 - 338.13
Sponsor: MAG
Status: Scoping
Total Cost: $1,689,000

View Funding Table
EPM PIN: 17058
Location: US-6; MP 159.73 - 160.17
Sponsor: MAG
Status: Scoping
Total Cost: $4,758,000

View Funding Table
EPM PIN: 17060
Location: Cnty:FA-2868; MP .00 - 1.46
Sponsor: MAG
Status: Scoping
Total Cost: $1,656,522

View Funding Table
EPM PIN: 17061
Location: Cnty:FA-2881; MP 7.56 - 8.86
Sponsor: MAG
Status: Scoping
Total Cost: $1,443,439

View Funding Table
EPM PIN: 17062
Location: New Road Extending North along 1200 w
Sponsor: MAG
Status: Scoping
Total Cost: $2,347,826

View Funding Table
EPM PIN: 17063
Location: Mapleton Lateral Canal Trail Phase 3
Sponsor: UDOT
Status: Scoping
Total Cost: $3,982,000

View Funding Table
EPM PIN: 17064
Location: SR-68; MP 31.96 - 32.38
Sponsor: UDOT
Status: Active
Total Cost: $314,000

View Funding Table
EPM PIN: 17067
Location: Cnty:FA-2950; MP 2.84 - 2.87
Sponsor: MAG
Status: Scoping
Total Cost: $607,000

View Funding Table
EPM PIN: 17068
Location: New Trail through Art Dye Park
Sponsor: MAG
Status: Scoping
Total Cost: $637,000

View Funding Table
EPM PIN: 17069
Location: Cnty:FA-2894; MP 1.18 - 2.26
Sponsor: MAG
Status: Scoping
Total Cost: $2,693,450

View Funding Table
EPM PIN: 17091
Location: SR-198; MP 5.65 - 5.75
Sponsor: UDOT
Status: Scoping
Total Cost: $535,428

View Funding Table
EPM PIN: 17100
Location: Various sidewalk locations in Pleasant Grove
Sponsor: UDOT
Status: Scoping
Total Cost: $47,601

View Funding Table
EPM PIN: 17206
Location: I-15; MP 281.99 - 284.68
Sponsor: UDOT
Status: Scoping
Total Cost: $10,000

View Funding Table
EPM PIN: 17208
Location: SR-129; MP .51 - .59
Sponsor: UDOT
Status: Scoping
Total Cost: $250,000

View Funding Table
EPM PIN: 17214
Location: SR-114; MP 9.03 - 9.19 & Cnty:FA-2943; MP .00 - .04
Sponsor: UDOT
Status: Scoping
Total Cost: $1,056,000

View Funding Table
EPM PIN: 17319
Location: I-15; MP 274.38 - 276.19
Sponsor: UDOT
Status: Scoping
Total Cost: $5,000,000

View Funding Table
EPM PIN: 17329
Location: SR-135; MP .00 - .05
Sponsor: UDOT
Status: Scoping
Total Cost: $254,000

View Funding Table
EPM PIN: 17415
Location: SR-85 Extension / Foothill Blvd in Saratoga Springs
Sponsor: UDOT
Status: Scoping
Total Cost: $5,903,229

View Funding Table
EPM PIN: 17416
Location: I-15; MP 258.10 - 259.70
Sponsor: UDOT
Status: Scoping
Total Cost: $20,000,000

View Funding Table
EPM PIN: 17434
Location: SR-198; MP 9.50 - 9.51
Sponsor: UDOT
Status: Undr Const
Total Cost: $250,000

View Funding Table
EPM PIN: 17494
Location: SR-145; MP 4.42 - 4.44 & SR-145; MP 2.86 - 2.88
Sponsor: UDOT
Status: Undr Const
Total Cost: $157,526

View Funding Table
EPM PIN: 17499
Location: US-89; MP 347.80 - 353.41 & SR-180; MP .00 - 1.06 & SR-145; MP 6.60 - 6.87 & SR-145; MP .00 - .90 & SR-92; MP 7.30 - 7.80 & SR-73; MP 34.90 - 35.71 & SR-73; MP 35.71 - 36.16 & US-89; MP 349.73 - 349.86 & US-89; MP 353.06 - 353.41 & SR-92; MP .00 - .1
Sponsor: UDOT
Status: Active
Total Cost: $4,250,000

View Funding Table
EPM PIN: 17502
Location: SR-114; MP .00 - 1.70
Sponsor: UDOT
Status: Active
Total Cost: $1,850,000

View Funding Table
EPM PIN: 17562
Location: SR-68; MP 30.47 - 30.48
Sponsor: UDOT
Status: Active
Total Cost: $250,000

View Funding Table
EPM PIN: 17564
Location: Cnty:FA-2946; MP 5.00 - 6.37
Sponsor: UDOT
Status: Active
Total Cost: $3,000,000

View Funding Table
EPM PIN: 18109
Location: Cnty:FA-2946; MP 5.25 - 6.37
Sponsor: UDOT
Status: Scoping
Total Cost: $4,000,000

View Funding Table
EPM PIN: 18144
Location: Railroad consolidation
Sponsor: UDOT
Status: Scoping
Total Cost: $16,839,272

View Funding Table
EPM PIN: 18198
Location: SR-129; MP 1.37 - 1.50
Sponsor: UDOT
Status: Scoping
Total Cost: $44,902

View Funding Table
EPM PIN: 18316
Location: US-89; MP 346.07 - 346.27
Sponsor: UDOT
Status: Undr Const
Total Cost: $240,000

View Funding Table
EPM PIN: 18323
Location: SR-51; MP .00 - 3.34 & SR-51; MP .00 - 3.37
Sponsor: UDOT
Status: Active
Total Cost: $1,100,000

View Funding Table
EPM PIN: 18329
Location: SR-265; MP .00 - .96 & US-189; MP .00 - .18 & TO PLEASANT GROVE / LINDON; MP .00 - .46 & FROM PLEASANT GROVE / LINDON; MP .00 - .32 & FROM PLEASANT GROVE / LINDON; MP .00 - .23 & TO PLEASANT GROVE / LINDON; MP .00 - .06 & TO PLEASANT GROVE / LINDON;
Sponsor: UDOT
Status: Active
Total Cost: $1,900,000

View Funding Table
EPM PIN: 18331
Location: SR-147; MP .00 - 11.69 & SR-141; MP .00 - 6.57
Sponsor: UDOT
Status: Active
Total Cost: $2,600,000

View Funding Table
EPM PIN: 18341
Location: Cnty:FA-2883; MP 7.54 - 9.17 & New Foothill/MVC alignment
Sponsor: UDOT
Status: Scoping
Total Cost: $3,000,000

View Funding Table
EPM PIN: 18365
Location: US-189; MP 1.08 - 1.58
Sponsor: UDOT
Status: Scoping
Total Cost: $49,000,000

View Funding Table
EPM PIN: 18396
Location: SR-178; MP .55 - .55
Sponsor: UDOT
Status: Undr Const
Total Cost: $433,626

View Funding Table
EPM PIN: 18397
Location: SR-115; MP .53 - .54
Sponsor: UDOT
Status: Undr Const
Total Cost: $566,000

View Funding Table
EPM PIN: 18420
Location: Region 3
Sponsor: UDOT
Status: Active
Total Cost: $30,000

View Funding Table
EPM PIN: 18428
Location: Cnty:FA-2946; MP 5.24 - 6.37 & SR-241; MP .00 - .42
Sponsor: UDOT
Status: Scoping
Total Cost: $35,000,000

View Funding Table
EPM PIN: 18439
Location: I-15; MP 255.50 - 256.50 & I-15; MP 255.50 - 256.50
Sponsor: UDOT
Status: Scoping
Total Cost: $5,000,000

View Funding Table
EPM PIN: 18499
Location: Region 3
Sponsor: UDOT
Status: Active
Total Cost: $35,000

View Funding Table
EPM PIN: 18529
Location: SR-68; MP 32.30 - 32.50
Sponsor: UDOT
Status: Undr Const
Total Cost: $296,000

View Funding Table
EPM PIN: 18619
Location: US-189; MP 10.66 - 10.79 & US-189; MP 7.37 - 7.48 & TO US-189; MP .00 - .05 & ON RAMP FROM US-189 TO SR-52; MP .01 - .09 & OFF RAMP TO US-189; MP .00 - .11 & SR-52; MP 3.90 - 4.12
Sponsor: UDOT
Status: Undr Const
Total Cost: $259,782

View Funding Table
EPM PIN: 18697
Location: SR-92; MP 2.03 - 2.04
Sponsor: UDOT
Status: Undr Const
Total Cost: $300,000

View Funding Table
EPM PIN: 18850
Location: US-6; MP 177.45 - 177.95
Sponsor: UDOT
Status: Undr Const
Total Cost: $999,500

View Funding Table
EPM PIN: 18918
Location: City of Orem
Sponsor: UDOT
Status: Scoping
Total Cost: $30,000

View Funding Table
EPM PIN: 18934
Location: US-89; MP 326.92 - 327.10
Sponsor: UDOT
Status: Active
Total Cost: $365,000

View Funding Table
EPM PIN: 18935
Location: SR-198; MP 7.57 - 7.58
Sponsor: UDOT
Status: Undr Const
Total Cost: $375,000

View Funding Table
EPM PIN: 18937
Location: Lehi shed
Sponsor: UDOT
Status: Undr Const
Total Cost: $1,244,176

View Funding Table
EPM PIN: 18944
Location: US-89; MP 325.21 - 325.22
Sponsor: UDOT
Status: Undr Const
Total Cost: $322,342

View Funding Table
EPM PIN: 18986
Location: Historic Utah South Rail Trail
Sponsor: UDOT
Status: Scoping
Total Cost: $300,000

View Funding Table
EPM PIN: 18987
Location: SR-85; MP .00 - .40 & SR-73; MP 35.00 - 35.70
Sponsor: UDOT
Status: Active
Total Cost: $90,000

View Funding Table
EPM PIN: 18990
Location: SR-51; MP .91 - 1.16
Sponsor: UDOT
Status: Undr Const
Total Cost: $332,000

View Funding Table
EPM PIN: 18994
Location: Extension of 800 South westward
Sponsor: UDOT
Status: Undr Const
Total Cost: $125,000

View Funding Table
EPM PIN: 18995
Location: Springville City
Sponsor: UDOT
Status: Active
Total Cost: $85,000

View Funding Table
EPM PIN: 18996
Location: Vineyard City
Sponsor: UDOT
Status: Scoping
Total Cost: $85,000

View Funding Table
EPM PIN: 18997
Location: Santaquin
Sponsor: UDOT
Status: Active
Total Cost: $50,000

View Funding Table
EPM PIN: 19018
Location: Central Corridor Transit study
Sponsor: UDOT
Status: Scoping
Total Cost: $1,000,000

View Funding Table
EPM PIN: 19020
Location: Cnty:FA-2878; MP 3.59 - 5.32
Sponsor: UDOT
Status: Scoping
Total Cost: $7,376,300

View Funding Table
EPM PIN: 19021
Location: Cnty:FA-2848; MP 1.34 - 1.56
Sponsor: UDOT
Status: Scoping
Total Cost: $5,168,000

View Funding Table
EPM PIN: 19022
Location: SF Parkway RR crossing
Sponsor: UDOT
Status: Scoping
Total Cost: $3,009,850

View Funding Table
EPM PIN: 19024
Location: Cnty:FA-2960; MP .50 - .60
Sponsor: UDOT
Status: Scoping
Total Cost: $3,825,000

View Funding Table
EPM PIN: 19025
Location: Trail
Sponsor: UDOT
Status: Scoping
Total Cost: $4,000,000

View Funding Table
EPM PIN: 19072
Location: Jordan River to 800 E
Sponsor: UDOT
Status: Scoping
Total Cost: $585,650

View Funding Table
EPM PIN: 19073
Location: 1300 W
Sponsor: UDOT
Status: Scoping
Total Cost: $670,650

View Funding Table
EPM PIN: 19074
Location: Cnty:FA-2870; MP 2.43 - 4.70
Sponsor: UDOT
Status: Scoping
Total Cost: $9,504,000

View Funding Table
EPM PIN: 19075
Location: Provo Municipal Airport
Sponsor: UDOT
Status: Scoping
Total Cost: $15,000,000

View Funding Table
EPM PIN: 19076
Location: UTA Utah County
Sponsor: UDOT
Status: Scoping
Total Cost: $321,785

View Funding Table
EPM PIN: 19077
Location: Utah Lakeshore Trail AF segment
Sponsor: UDOT
Status: Scoping
Total Cost: $2,849,200

View Funding Table
EPM PIN: 19078
Location: SR-198; MP 5.32 - 5.39
Sponsor: UDOT
Status: Scoping
Total Cost: $392,000

View Funding Table
EPM PIN: 19079
Location: Cnty:FA-2963; MP .50 - .60
Sponsor: UDOT
Status: Scoping
Total Cost: $1,636,250

View Funding Table
EPM PIN: 19080
Location: Cnty:FA-2935; MP 1.40 - 1.50 & Cnty:FA-2963; MP .00 - .10
Sponsor: UDOT
Status: Scoping
Total Cost: $1,028,500

View Funding Table
EPM PIN: 19086
Location: Cnty:FA-2995; MP 3.54 - 3.97
Sponsor: UDOT
Status: Scoping
Total Cost: $1,565,700

View Funding Table
EPM PIN: 19087
Location: Foothill Blvd
Sponsor: UDOT
Status: Scoping
Total Cost: $8,500,000

View Funding Table
EPM PIN: 19088
Location: Cnty:FA-1828; MP 10.17 - 10.84 & Goshen Center street
Sponsor: UDOT
Status: Scoping
Total Cost: $966,780

View Funding Table
EPM PIN: 19089
Location: new alignment with roundabout
Sponsor: UDOT
Status: Scoping
Total Cost: $1,371,900

View Funding Table
EPM PIN: 19090
Location: Cnty:FA-2894; MP 1.24 - 1.67
Sponsor: UDOT
Status: Scoping
Total Cost: $1,732,300

View Funding Table
EPM PIN: 19091
Location: SR-92; MP 7.49 - 7.70
Sponsor: UDOT
Status: Undr Const
Total Cost: $300,000

View Funding Table
EPM PIN: 19097
Location: Pleasant Grove 2600 N; 1550 W to 900 W
Sponsor: UDOT
Status: Funding
Total Cost: $2,038,000

View Funding Table
EPM PIN: 19098
Location: UTA
Sponsor: UDOT
Status: Scoping
Total Cost: $364,261

View Funding Table
EPM PIN: 19099
Location: 600 N FOURTH LEG
Sponsor: UDOT
Status: Scoping
Total Cost: $1,117,000

View Funding Table
EPM PIN: 19100
Location: SR-156; MP .78 - 1.19
Sponsor: UDOT
Status: Scoping
Total Cost: $4,963,951

View Funding Table
EPM PIN: 19101
Location: US-6; MP 159.05 - 159.76
Sponsor: UDOT
Status: Scoping
Total Cost: $5,270,000

View Funding Table
EPM PIN: 19102
Location: Cnty:FA-2860; MP .67 - .80
Sponsor: UDOT
Status: Scoping
Total Cost: $794,750

View Funding Table
EPM PIN: 19110
Location: US-189; MP 1.27 - 1.45
Sponsor: UDOT
Status: Undr Const
Total Cost: $70,000

View Funding Table
EPM PIN: 19157
Location: US-89; MP 306.85 - 313.56
Sponsor: UDOT
Status: Active
Total Cost: $2,550,000

View Funding Table
EPM PIN: 19268
Location: US-6; MP 194.78 - 196.79
Sponsor: UDOT
Status: Scoping
Total Cost: $35,400,000

View Funding Table
EPM PIN: 19313
Location: SR-114; MP 4.06 - 4.94
Sponsor: UDOT
Status: Scoping
Total Cost: $20,000,000

View Funding Table
EPM PIN: 19374
Location: Region 3 Headquarters
Sponsor: UDOT
Status: Scoping
Total Cost: $1

View Funding Table
EPM PIN: 19375
Location: SR-75; MP 1.80 - 2.02
Sponsor: UDOT
Status: Scoping
Total Cost: $150,000

View Funding Table
EPM PIN: 19394
Location: SR-115; MP 7.80 - 7.90
Sponsor: UDOT
Status: Scoping
Total Cost: $73,460

View Funding Table
EPM PIN: 19395
Location: 1355 South; 400 E to 700 E and 800 E; Brookside Dr to 650 S
Sponsor: UDOT
Status: Scoping
Total Cost: $195,000

View Funding Table
EPM PIN: 19396
Location: Cnty:FA-2896; MP .79 - 1.28
Sponsor: UDOT
Status: Scoping
Total Cost: $75,000

View Funding Table
EPM PIN: 19398
Location: Loader Avenue from 300 South to 500 South
Sponsor: UDOT
Status: Scoping
Total Cost: $100,000

View Funding Table
EPM PIN: 19423
Location: SR-145; MP .60 - .80
Sponsor: UDOT
Status: Undr Const
Total Cost: $270,000

View Funding Table
EPM PIN: 19489
Location: SR-194; MP 2.70 - 3.00 & FROM SR-92 ALPINE / HIGHLAND; MP .91 - 1.10 & Signal upgrades on SR-194
Sponsor: UDOT
Status: Active
Total Cost: $200,000

View Funding Table
EPM PIN: 19508
Location: Cnty:FA-3040; MP .00 - .15 & US-189; MP 2.85 - 3.00
Sponsor: UDOT
Status: Scoping
Total Cost: $1,509,487

View Funding Table
EPM PIN: 19554
Location: SANTAQUIN CANYON ROAD
Sponsor: UDOT
Status: Scoping
Total Cost: $1,800,000

View Funding Table
EPM PIN: 19586
Location: SR-92; MP .95 - 1.40
Sponsor: UDOT
Status: Undr Const
Total Cost: $300,000

View Funding Table
EPM PIN: 19638
Location: I-15; MP 258.50 - 259.50
Sponsor: UDOT
Status: Scoping
Total Cost: $200,000

View Funding Table
EPM PIN: 19754
Location: SR-74; MP .30 - 1.50
Sponsor: UDOT
Status: Scoping
Total Cost: $1,850,000

View Funding Table
EPM PIN: 19764
Location: SR-68; MP 25.00 - 25.50
Sponsor: UDOT
Status: Scoping
Total Cost: $4,100,000

View Funding Table
EPM PIN: 19765
Location: SR-92; MP 2.40 - 2.50
Sponsor: UDOT
Status: Undr Const
Total Cost: $50,000

View Funding Table
EPM PIN: 19771
Location: SR-145; MP 6.18 - 6.19
Sponsor: UDOT
Status: Scoping
Total Cost: $285,000

View Funding Table
EPM PIN: 19775
Location: Wetlands Monitoring & Weed Cont Vineyard Station
Sponsor: UDOT
Status: Scoping
Total Cost: $25,000

View Funding Table
EPM PIN: 19800
Location: SR-92; MP 6.60 - 7.35
Sponsor: UDOT
Status: Active
Total Cost: $1,300,000

View Funding Table
EPM PIN: 19805
Location: US-89; MP 342.80 - 346.20 & US-89; MP 340.00 - 341.50
Sponsor: UDOT
Status: Active
Total Cost: $4,909,569

View Funding Table
EPM PIN: 19808
Location: US-189; MP 7.04 - 7.05
Sponsor: UDOT
Status: Scoping
Total Cost: $375,000

View Funding Table
EPM PIN: 19820
Location: US-189; MP 1.00 - 1.15
Sponsor: UDOT
Status: Scoping
Total Cost: $25,000

View Funding Table
EPM PIN: 19825
Location: SR-145; MP .00 - 6.86
Sponsor: UDOT
Status: Scoping
Total Cost: $150,000

View Funding Table
EPM PIN: 19872
Location: SR-52; MP .00 - .16 & SR-176; MP .00 - .40
Sponsor: UDOT
Status: Advertised
Total Cost: $350,000

View Funding Table
EPM PIN: 19873
Location: I-15 overpass and study area
Sponsor: UDOT
Status: Scoping
Total Cost: $50,000

View Funding Table
EPM PIN: 19890
Location: ped structure over future Vineyard connector road
Sponsor: UDOT
Status: Scoping
Total Cost: $11,028,000

View Funding Table
EPM PIN: 19908
Location: Region 3
Sponsor: UDOT
Status: Scoping
Total Cost: $15,000

View Funding Table
EPM PIN: 19954
Location: SR-178; MP .00 - .20
Sponsor: UDOT
Status: Scoping
Total Cost: $50,000

View Funding Table
EPM PIN: 20023
Location: I-15; MP 274.30 - 274.80
Sponsor: UDOT
Status: Scoping
Total Cost: $750,000

View Funding Table
EPM PIN: 20044
Location: SR-129; MP 4.70 - 4.95
Sponsor: UDOT
Status: Scoping
Total Cost: -

View Funding Table
EPM PIN: 20078
Location: Lehi Frontrunner Station
Sponsor: UDOT
Status: Scoping
Total Cost: -

View Funding Table
EPM PIN: 20096
Location: SR-156; MP .52 - .57
Sponsor: UDOT
Status: Scoping
Total Cost: -

View Funding Table
EPM PIN: 20110
Location: SR-145; MP .90 - 1.15
Sponsor: UDOT
Status: Scoping
Total Cost: -

View Funding Table
EPM PIN: 20113
Location: I-15; MP 249.90 - 279.80 & I-15; MP 249.90 - 279.80
Sponsor: UDOT
Status: Active
Total Cost: $11,400,000

View Funding Table
EPM PIN: 20115
Location: Salem City
Sponsor: UDOT
Status: Scoping
Total Cost: -

View Funding Table
EPM PIN: 20119
Location: SR-73; MP 31.84 - 31.86
Sponsor: UDOT
Status: Scoping
Total Cost: $200,000

View Funding Table
EPM PIN: 20124
Location: I-15; MP 258.40 - 259.50 & Cnty:FA-2845; MP .00 - 2.31 & I-15; MP 258.60 - 259.60
Sponsor: UDOT
Status: Scoping
Total Cost: $15,000,000

View Funding Table
EPM PIN: 20130
Location: I-15; MP 284.26 - 284.40
Sponsor: UDOT
Status: Active
Total Cost: $250,000

View Funding Table
EPM PIN: 20174
Location: Heber Maintenance shed
Sponsor: UDOT
Status: Scoping
Total Cost: -

View Funding Table
EPM PIN: 20182
Location: SR-129; MP 6.66 - 6.67
Sponsor: UDOT
Status: Scoping
Total Cost: $150,000

View Funding Table
EPM PIN: 20238
Location: SR-92; MP 5.44 - 5.47
Sponsor: UDOT
Status: Scoping
Total Cost: $250,000

View Funding Table
EPM PIN: 20240
Location: US-89; MP 328.69 - 328.70
Sponsor: UDOT
Status: Scoping
Total Cost: $150,000

View Funding Table
EPM PIN: 20255
Location: Frontrunner South
Sponsor: UDOT
Status: Scoping
Total Cost: $5,000,000

View Funding Table
EPM PIN: 20262
Location: SR-92 western extension
Sponsor: UDOT
Status: Scoping
Total Cost: $4,000,000

View Funding Table
EPM PIN: 20278
Location: I-15; MP 250.80 - 252.70 & I-15; MP 251.00 - 252.70
Sponsor: UDOT
Status: Scoping
Total Cost: -

View Funding Table
EPM PIN: 20282
Location: SR-147; MP 11.74 - 11.87 & Cnty:FA-3064; MP .33 - .40
Sponsor: UDOT
Status: Scoping
Total Cost: $80,000

View Funding Table
EPM PIN: 20283
Location: SR-178; MP .17 - .28
Sponsor: UDOT
Status: Scoping
Total Cost: -

View Funding Table
EPM PIN: 20349
Location: Provo 900 E UVX Station
Sponsor: UDOT
Status: Funding
Total Cost: $4,293,315

View Funding Table
EPM PIN: 20350
Location: UTA Park and Ride lot in the Eagle Mountain and Saratoga Springs area.
Sponsor: UDOT
Status: Funding
Total Cost: $4,685,478

View Funding Table
EPM PIN: 20351
Location: Vineyard Regional Trail Enhancements
Sponsor: UDOT
Status: Funding
Total Cost: $885,478

View Funding Table
EPM PIN: 20352
Location: Eagle Mountain Ranches Trail; Pony Exp PK to SR-73
Sponsor: UDOT
Status: Funding
Total Cost: $1,320,137

View Funding Table
EPM PIN: 20353
Location: "Orem Lakeview PKWY, Geneva RD to 2000 S"
Sponsor: UDOT
Status: Funding
Total Cost: $14,698,200

View Funding Table
EPM PIN: 20354
Location: Provo River Trail; Columbia LN to Univ. PKWY
Sponsor: UDOT
Status: Funding
Total Cost: $4,646,709

View Funding Table
EPM PIN: 20355
Location: "Utah Lakeshore Trail, Orem to Provo"
Sponsor: UDOT
Status: Funding
Total Cost: $4,947,000

View Funding Table
EPM PIN: 20356
Location: Saratoga Rd and Pony Express Widening
Sponsor: UDOT
Status: Funding
Total Cost: $9,012,550

View Funding Table
EPM PIN: 20357
Location: Pony Express Pkwy; Lehi Center St to Vineyard Connector
Sponsor: UDOT
Status: Funding
Total Cost: $12,683,700

View Funding Table
EPM PIN: 20358
Location: Provo 820 N Bridge Replacement
Sponsor: UDOT
Status: Funding
Total Cost: $13,670,550

View Funding Table
EPM PIN: 20359
Location: Spanish Fork 2000 E US-6 Connection Ph2
Sponsor: UDOT
Status: Funding
Total Cost: $5,040,500

View Funding Table
EPM PIN: 20360
Location: Provo 600 S Trail; 200 E to 100 W
Sponsor: UDOT
Status: Funding
Total Cost: $795,600

View Funding Table
EPM PIN: 20361
Location: Provo S State ST Trail; 300 S to 900 S
Sponsor: UDOT
Status: Funding
Total Cost: $1,445,000

View Funding Table
EPM PIN: 20362
Location: Highland Mitchel Hollow Trail; 6800 W to 10100 N
Sponsor: UDOT
Status: Funding
Total Cost: $2,527,050

View Funding Table
EPM PIN: 20363
Location: North County Blvd / SR-92 Improvements
Sponsor: UDOT
Status: Funding
Total Cost: $5,461,250

View Funding Table
EPM PIN: 20364
Location: Eagle Mountain Airport RD; Pony Exp PKWY to SR-73
Sponsor: UDOT
Status: Funding
Total Cost: $7,817,450

View Funding Table
EPM PIN: 20365
Location: Springville 2600 West; 400 N to SR-75
Sponsor: UDOT
Status: Funding
Total Cost: $11,153,700

View Funding Table
EPM PIN: 20366
Location: 400 E to 5 lanes from Crossroads Blvd to Grassland Dr in Saratoga Springs
Sponsor: UDOT
Status: Funding
Total Cost: $3,579,350

View Funding Table
EPM PIN: 20367
Location: Woodland Hills DR / 8800 S Intersection Imp.
Sponsor: UDOT
Status: Funding
Total Cost: $2,852,600

View Funding Table
EPM PIN: 20368
Location: Payson Canyon Trail
Sponsor: UDOT
Status: Funding
Total Cost: $5,419,600

View Funding Table
EPM PIN: 20369
Location: Provo Bike Collective Building
Sponsor: UDOT
Status: Funding
Total Cost: $382,500

View Funding Table
EPM PIN: 20374
Location: SR-114; MP 6.15 - 6.50
Sponsor: UDOT
Status: Scoping
Total Cost: -

View Funding Table
EPM PIN: 20379
Location: SR-145; MP 3.80 - 3.90
Sponsor: UDOT
Status: Scoping
Total Cost: -

Reset List