Choose Fund

Fund Prior Ob. Total 2023 Total 2024 Total 2025 Total 2026 Total CD Total
Total$236M$765M$209M$46M$55M$13M$1B
ST_GF_CHN$38M$353,873----$38M
ST_CORR_PRES$48M$24M----$72M
HSIP$4M$3M$2M---$9M
ST_TIF$2M$446M$30M---$479M
ST_RET_ROW$151,599-----$151,599
ST_ATMS$22,100$102,900----$125,000
STP_FLX_ST$24M$30M----$53M
R/H_HZ_ELM1$165,867$2M----$3M
R/H_HZ_EL90S-------
R/H_DEVIC90S$139,434-----$139,434
NHS$2M-----$2M
NHPP_NHS$21M$14M----$36M
HSIP_VRU-$1M$440,000---$2M
NHPP_BR$2M$26M$16M---$43M
ST_BRIDGE$2M$941,338----$3M
ST_TRANS_SOL$3M$891,930----$3M
EM_RPF1@93.2$2M-----$2M
CMAQ_MAG$5M$10M$5M$2M$3M-$25M
STP_URB_P/O$310,173-----$310,173
LOCAL_INKIND-$140,511----$140,511
LOCAL_GOVT$14M$62M----$76M
STP_UB_P/O_U$29M$960,979----$30M
L_BETTERMENT$2M$502,886----$3M
SEC154_HSIP-------
ST_CONCPT_D3$257,559-----$257,559
ST_PVMT_LV2-$1M----$1M
ST_TIF_HB433$327,899$42M$74M--$11M$128M
ST_TIF_EXCH-------
ST_TIFEX_MAG$14M$7M----$21M
ST_SAFE_SIDE-$63,850----$63,850
L_PASS_MATCH-$1M----$1M
ST_PVMT$728,948$3M----$3M
ST_MATCH-$80,000----$80,000
TAP_URB_MAG$2M$866,000$966,780$885,478$1M-$6M
CMAQ_PM2.5---$2M$900,000-$3M
LOCAL_MATCH$215$2M----$2M
TAP_SU_MAG----$200,000-$200,000
L_CORR_UTCO$1M$3M----$4M
ST_SIGNALS$8M$1M----$9M
LOCAL_UNCOL-$17M----$17M
ST_CONT_R3$1M$1M----$2M
MAG_EXCHANGE-$11M$8M---$19M
HSIP_100%$256,546-----$256,546
ST_TOLL_CR-$18,629----$18,629
STP_HIF_P/O$2M$247,471----$2M
R/H_HZ_ELM90-------
ST_EXCH_MAG-$225,000----$225,000
UTA_FUNDS$60,000$2M----$2M
STP_COVID_PO$316,258$3M----$4M
R/H_DEVICS90$160,000-----$160,000
EM_HPP_1702-$2M----$2M
ST_ITS-$65,000----$65,000
STP_BRIDGE$45,000$2M----$2M
TIGER_MAG-$3M----$3M
ST_TTIF-$6M----$6M
STP_SU_MAG$408,700$573,300$4M-$885,478-$6M
FA_MISC_100%-$7M----$7M
NHPP_IM$100,000$2M----$2M
STP_COVID_ST$6M$10M----$16M
ST_TSP_MS4$867,240$376,937----$1M
UTCO_BOND-$670,650$52M---$53M
ST_TIF_ ACT-$11M----$11M
LOCAL_MAG-$382,500-$4M$16M$2M$23M
ST_SIGNL_M&O$200,000-----$200,000
FLHP-$2M----$2M
OTHER-$50,000----$50,000
ST_STUDIES-$100,000----$100,000
ST_INS-RECOV$2,514$247,486----$250,000
UTCO_TRAN_TX--$15M$37M$33M-$86M
6

STP_URB_P/O
Projects

$310,173

Total Obligation

>1% of the TIP obligation

About this fund

Program funds may be spent on any road that is functionally classified as a collector or higher for roadways within the MPO. Projects include rehabilitation, new construction, corridor and environmental studies and bridge replacement. Eligible non-road projects include planning studies, pedestrian and bike improvements, trails, transit projects, signal coordination, and administrative purposes. The population of the urbanized area is used to allocate the Surface Transportation Program (STP) - Provo/Orem Urban Area funds. This area stretches from Payson to northern Eagle Mountain. These funds can be used on projects anywhere within the MPO area.

Projects

Lindon Heritage Trail - Pioneer LN to Utah Lake